performance metrics的意思
performance metrics中文翻譯:
性能標準
相似詞語短語
performance artist───表演藝術(performanceart的變形)
performance artists───表演藝術(performanceart的變形)
performance arts───表演藝術
performance cars───性能車
performance drugs───性能藥物
performance ratings───性能狀態;額定性能
performance review───服務表現檢討;業績評價
performance tests───操作測驗;作業測驗
performance anxieties───n.表現焦慮;作業焦慮;n.怯場
雙語使用場景
Defines and monitors key performance metrics.───定義和監測關鍵績效指標.
Delay is the foundation for accurately measuring network performance metrics such as delay jitter, bandwidth, etc.───時延是準確測量時延抖動 、 寬等網絡性能指標的基礎.
Performance metrics for Oracle and IBM databases.───Oracle和IBM數據庫的性能指標。
Manage supplier performance metrics for on time delivery, quality and cost.───管理供應商按時交貨 、 質量和成本的表現度量表.
Capability to save and compare performance metrics.───有能力保存并比較性能指標。
Collects 150 performance metrics from the system under test.───從被測試的系統收集150個性能指標。
The performance metrics of interest include average delay, average energy consumption, and average throughput.───感興趣之效能指標包含平均延遲, 平均能量消耗, 與平均成功送達率.
英語使用場景
Delay is the foundation for accurately measuring network performance metrics such as delay jitter, bandwidth, etc.
Manage supplier performance metrics for on time delivery, quality and cost.
This paper introduces the architecture of on-demand data broadcast and the performance metrics, analysis the basic scheduling algorithm, preemptive scheduling and real-time scheduling algorithms.
Regular internal reporting to management and shareholders according to IFRS, including performance metrics tracking and analysis.
The U.S. hotel industry reported mixed results in the three key performance metrics for the first half of 2010 in year-over-year measurements, according to data from STR.
Continually capture and share operating and performance metrics and ket statistics each resource.
This algorithm can get performance metrics such as the packet loss rate, round trip time, and latency variation according to the returned status of the measuring probe packets.
And to qualify for a federal Title IV-E block grant, agencies must generate performance metrics on a daily basis to prove that the allocations are creating the desired effect.
The performance metrics of interest include average delay, average energy consumption, and average throughput.