tower crane的意思
tower crane中文翻譯:
塔式起重機
crane tower───塔式起重機
yellow crane tower───n.黃鶴樓,中國武漢
crane───n.(Crane)人名;(意、葡)克拉內;(英、法、西)克蘭;vi.伸著脖子看;遲疑,躊躇;n.吊車,起重機;鶴;vt.用起重機起吊;伸長脖子
tower───n.(Tower)人名;(英)托爾;n.塔;高樓;堡壘;vi.高聳;超越
stacker crane───自動存取機高架吊車;塔式起重機;碼垛機
crane fly───n.盲蛛;[昆]大蚊;n.大蚊盲蛛
siberian crane───西伯利亞鶴
gantry crane───n.龍門起重機,高架移動起重機; 門座起重機; 跨運吊車
blue crane───藍(蓑羽)鶴(南非國鳥);藍蓑羽鶴
Tower crane area in the site shall be fenced.───塔吊吊裝區域用圍欄做防護。
Not through the acceptance shall not be put to use by the tower crane testing unit testing qualified.───未通過驗收,未經檢測單位檢測合格的高層塔吊不得投入使用。
tower crane is mainly composed of vertical tower, horizontal tower, tower tower and balance arm, as shown in Figure 3.67.───塔式起重機主要由豎直塔身、水平塔臂、塔頂和平衡臂等主要部件組成,如圖3.67所示。
It is shown in the load-displacement curve that the instability failure of the tower crane is maximum point instability.───從荷載—位移全過程曲線可以看出,塔吊的失穩為極值點失穩,失穩破壞為延性破壞。
Grand Tower Crane is willing to unite with you create quality works.───宏大塔機愿與您同心共創優質工程。
The Data Acquisition System is mainly used to measure the angle, lifting height and the weight in the process of the tower crane working.───塔機工況參數數據采集系統主要對塔機工作過程中的角度、起升高度、稱重量進行檢測。
The tower crane boom structural design and mechanical analysis, finite element method can be regarded as a good way.───對于動臂塔機的結構設計和力學分析,有限元法不失為一種好方法。
The maximum displacement at the top of the higher tower crane is larger than that of the lower one.───塔機頂點最大位移隨著塔機高度的增加而增大。
A snail crawls out of rubble and climbs towards a tower crane on a construction site.───一只蝸牛從瓦礫下爬出來,朝著建筑工地的吊塔爬上去。
Several attaching points are usually provided on the column of self-elevating tower crane in connection with the building under construction.
Taking the operation process for stress detection of the tower crane as the study object, with the application of process procedure analysis, ...
There are 603 machines and equipment including rooter, tower crane, pile driver, etc.
The tower crane is a kind of machine widely used in construction industry. It possesses complex coupling movement due to frequent starting and braking during operation.
The letterpress analyses the acaleph bases mechanics state for the tower crane, and gives out the design formulas and design course.
The monitoring results show that the uneven settlements of tower crane base and data fluctuation range of tower body deformation are small enough to meet safe usage requirement.
Application: Main shaft of machine tool, auto steering structure, main shaft of lathe, grinder, milling machine, drill press, water power dynamotor, tower crane, screw shaft and so on.
Three 3500 W dysprosium lamps are installed on each tower crane for site lighting during night.
Walhalla. note the tower crane, they had the builders in!
中文翻譯推薦
- primary cells
- taessica
- taesha
- remote desktop client
- so precious
- she is very kind to us
- single ended tube
- time loop
- sphingomyelinase
- remote desktop client for android
- tell me the fact
- reach for ones hand
- see attached
- rocket model
- taest
- step aerobics
- tu st
- undermoderated
- tower cranes
- the grand national
- vehiclespeed