青年中文青年中文

stilling basin的意思

stilling basin中文翻譯:

消力池;靜水池;沉水池;[水利]消速池

相似詞語短語

basin───n.水池;流域;盆地;盆;n.(Basin)人名;(俄)巴辛;(法)巴贊

hand basin───洗手盆

stilling well───[建]靜水井;穩水井

emesis basin───[醫]嘔吐盆;盂盆

basin wrench───承盤扳鉗

flysch basin───飛行基地

tyrol basin───蒂羅爾盆地

river basin───n.江河流域;[水文]流域

exhumed basin───剝露盆地

雙語使用場景

This paper introduces a simple method for computing the depth of stilling basin by using the author's new formula.───本文采用筆者新近給出的收縮水深顯式計算公式,介紹一種簡單易行的計算消力池池深的新方法。

The stilling basin base plate supports large impact pressure in the impacted area.───消能塘底板在射流沖擊下,底板塊在沖擊區受到較大的沖擊壓力。

Somenew ideas are put forward for calculating the ratio of dissipation in stilling basin.───對消力池內消能率的計算提出了新的見解。

We examined in the regulating tank as well as in the stilling basin entire technical process trash leaching solution toxicity.───我們檢驗了在調節槽以及沉淀槽整個工藝流程中的垃圾瀝出液的毒性。

The simple shape can suit the large variable ranges of flood discharges, the short stilling basin and the low tail-weir.───該消能工體型簡單,能滿足表孔泄洪流量變化范圍大、消力池縱向長度小、尾坎低的要求。

But step height has less effect on on pressure of the stilling basin.───臺階高度的不同對消力池底板脈動壓強的影響十分微小。

After artifical roughness are used, the length behind hydraulic jump, stilling basin and the ridge's elevation are reduced. 2.───通過比較可知,加糙后水流平穩,降低躍后水深和尾坎高程,且不增加消力池長度。

Generally the end sill is adopted in the stilling basin.───泄水工程中大量應用設置尾檻的消力池。

Analysis of mechanism of jointed energy dissipation of stilling basin and aerated baffle and its validation by experiment───摻氣分流墩與消力池聯合應用消能機理分析與試驗驗證

英語使用場景

In the stability design of the bottom slab of stilling basin or water cushion pool for a long time past, a little attention was paid to the pulse load on the slab.

Stilling basin with T shaped baffle is horizontally bedded with auxiliary dissipator which has a T shaped baffle in plan and supporting leg connected with end sill.

The four-step energy dissipator had been adopted as stilling basin for the outlet of water delivery conduit of the Boshan Reservoir in Henan Province.

After the Kongdong reservoir water hole plate gate rebuild into a cone valve , the stilling basin, model test was conducted.

The study results show that the problem of over-high hydraulic indexes of the stilling basin of high head and large unit-width discharge can be solved with energy dissipator with step-down floor.