青年中文青年中文

core wall的意思

core wall中文翻譯:

心墻,隔心墻;隔水墻

相似詞語短語

core───n.核心;要點;果心;[計]磁心;vt.挖...的核;n.(Core)人名;(英)科爾;(西、意)科雷

wall to wall───遍地皆是

core bird───核心鳥

core team───核心團隊

wall───n.墻壁,圍墻;似墻之物;vt.用墻圍住,圍以墻;n.(Wall)人名;(英)沃爾;(德、芬、捷、瑞典)瓦爾;adj.墻壁的

core business───核心業務

cavity core───空腔核心

core mix───(模型)芯砂

home core───主核心

雙語使用場景

structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.───工程主壩結構形式為瀝青混凝土心墻砂礫石壩。

The reservoir dam is an earth dam with a clay core wall, built earliest in our country.───水庫大壩是我國建設最早的碾壓式粘土心墻土石壩。

core wall of asphalt concrete with placement was applied to low clam.───澆筑式瀝青混凝土心墻多用于低壩,易于施工。

Theoretical and shaking table test studies of the dynamic behavior of a core- wall suspension structures are performed.───結果表明,核筒懸掛結構具有較低的自振頻率,具有良好的抗震性能。

Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.───瀝青混凝土心墻堆石壩是土石壩的主要壩型之一。

Hebgen Dam, an earthfill structure with an unreinforced concrete core wall located on the Madison River at its entrance to Madison Canyon.───赫布根壩是土筑的結構,在麥迪遜河進入麥迪遜峽谷處有一個無加固凝土的芯墻。

It is designed to arrange a row of jet grouting impervious wall in the dam foundation along the centerline of clay core wall.───設計壩基在粘土心墻中心線布置一排高壓噴射灌漿防滲墻。

The practice indicates that the asphalt concrete adapts to the core wall of earth-rock dam in the cold region.───實踐表明,澆筑式瀝青混凝土適用于寒冷地區土石壩的防滲心墻。

soil used as seepage proof material for the core wall, the field compaction test was conducted.───為深入了解認識風化料和碎石土作為心墻防滲料的可靠性,開展了現場碾壓試驗研究。

英語使用場景

The law of observed water level change in piezometric tube is analyzed in this paper. Furthermore, the stability of soil core wall dam on the unsteady seepage is studied.

The final failure mode of the model is tension failure of perimeter columns and bottom of core wall on the tension side caused by overturning moment, and the story shear failure mode was not found.

This paper analyzed the inner force of the frame-concrete core wall structure with outrigger under the action of wind loading by ETABS.

For deeply recognizing the reliability of the weathered rock and crushed rock soil used as seepage proof material for the core wall, the field compaction test was conducted.

Results show that the displacement in horizontal direction and the maximum principal stress of core wall will increase to a larger extent if the creep effect of asphalt concrete is considered.

Conclusion two, the defect geomembranes can display its impervious character, reducing the risk of osmolar stability of the clay core wall which has the impervious flaw.

Twin towers designed by US based NBBJ Architect with reinforced concrete core wall system.