青年中文青年中文

construction progress的意思

construction progress中文翻譯:

施工進度

相似詞語短語

progress───vi.前進,進步;進行;n.進步,發展;前進;n.(Progress)人名;(贊)普羅格雷斯

construction───n.建設;建筑物;解釋;造句

significant progress───顯著進展;重大進展

industrial progress───[工經]工業進展;[工經]工業進步

technological progress───技術進步

progress indicator───進程指示器

rapid progress───快速的進展;飛速的發展;[醫]快速進展

in progress───進行中; 半路;正在進行;在發展中

no progress───沒有進展;沒有進步;沒有長進

雙語使用場景

roadbed construction methods together directly related to the construction progress and quality of the project.───路基的施工方法選擇直接關系到施工進度和工程質量。

Companies provide labor in this project. According to the safety and guarantee the construction progress Arrange labor.───本工程所需勞動力均由公司提供。根據安全和保證施工進度安排勞動力投入。

Saving hours of 50% — 70%, greatly accelerate the construction progress, shorten the construction period.───可節約工時50%——70%,大大加快施工進度,縮短施工周期。

We hope that there is no more change to the inspection procedures to avoid any delay of the construction progress.───我們希望驗收程序不要再有什么變化以免延誤施工進度。

Meanwhile, put a double team and equipment, 24 hours of continuous construction, drilling two ways to speed up the construction progress.───同時,投入雙倍的隊伍和設備,24小時連續施工,采取兩頭鉆進的辦法加快施工進度。

Work, and to ensure that generally do not occur during the construction impede construction progress and quality of fault.───工作,并保證在施工期間一般不發生有礙施工進度和質量的故障。

The utility model can considerably reduce present construction capacity as well as improve present construction progress.───本實用新型可大大減少了現場的施工量,提高了現場施工的進度。

Check up mechanical material& equipment to be site& check up monthly quantity of construction progress.───檢查工地材料機械設備,核對月進度工程量。

Because its working condition is bad, presents like on the breakdown frequently in the use, serious influence project construction progress.───由于其工作條件惡劣,在使用中經常出現如上故障,嚴重影響了工程施工進度。

英語使用場景

The construction progress payment shall be paid in accordance with 75% of the stated account in the interim payment certificate .

When work is started, the project manager submits a Construction Progress Form on which the schedule for materials procurement and phase-based acceptance is based.

Party A shall submit monthly report of construction progress on the 25th of each month; Party A must pay for the audited progress payment of 95% within 5 days.

Construction progress chart compiled with flow process without steps is difficult to show the critical path.

In addition, comprehensive comments of bridge construction progress calculation, implement and tolerance analysis has been done.

That Party A don't pay advance payment, progress payment and price difference in purchased materials via procurement agent as per contractual specifications influences construction progress.

At the same time, the crane operation efficiency is also a chief reason to effluence on construction progress.

The application of steam curing process for precast segmental beams of Humin Elevated Project has increased the early strength of concrete and met the requirements of construction progress.