青年中文青年中文

flood frequency的意思

flood frequency中文翻譯:

[水文]洪水頻率

相似詞語短語

frequency───n.頻率;頻繁

flood───vt.淹沒;充斥;把……填滿;vi.淹沒;(因洪水)離開(家園、生意);泛濫;(引擎)汽化器溢油(導致無法使用);血崩;涌現;n.洪水;漲潮;(詩/文)江河;泛濫;(眼淚或感情)迸發;一大批;n.(Flood)(美、英、加)弗勒德(人名)

frequency generator───[計]頻率發生器

frequency range───頻帶; 頻段;[電子][通信]頻率范圍

fluvial flood───洪水

first flood───第一次洪水

cumulative frequency───[統計]累積頻率,[電子]累積頻數

flood with───被…淹; 擠滿,充滿;淹沒

flood insurance───洪水保險;[保險]水災保險

雙語使用場景

Flood frequency (return period) is referring to recurrence probability of flood in certain period.───洪水頻率(或重現期)是指一定時期內某種洪水出現的機率。

Regional flood frequency analysis is the effective method for flood frequency analysis in data-lacked or non-data area.───區域洪水頻率分析是解決資料缺乏地區洪水頻率計算的一種方法。

Robust estimation has been applied in flood frequency analysis.───穩健估計在洪水頻率分析中的應用已被提出。

Nonparametric and parametric methods are commonly used in flood frequency analysis.───非參數法和參數法是水文頻率計算中常用的兩種方法。

A new method of least square is raised in curve fitting of flood frequency calculating and its specific properties are analysed.───提出了在洪水頻率計算時適線法中最小二乘方的一種新的求解方法,并對其特性進行分析。

This paper introduced the weighted kernel density estimation for flood frequency analysis and calculation.───本文引進加權核密度估計方法,研究洪水頻率的分析計算;

Intelligent optimization is a new way of design flood frequency curve optimization fitting.───智能優化算法是一種推求設計洪水頻率曲線統計參數的新途徑。

The overtopping model accounts for the uncertainties involved in hydrological observations and flood frequency models.───水壩溢頂模式考慮水文的觀測量之不確定性以及洪水頻率分布曲線之不確定。

Influence of ENSO on Flood Frequency along the California Coast.───對加州沿岸洪水頻率的影響。

英語使用場景

Considering the combined action of peak flood and flood volume, flood frequency use analysis by synthesis method in computer software.

Applicability of 3 intelligent optimization algorithms for design flood frequency was studied.

Regional flood frequency analysis for un-gauged basins included selecting a pooling-group, estimating the index flood, deriving pooled growth curve and fitting flood frequency curve for tested basin.

Flood frequency(return period)is referring to recurrence probability of flood in certain period.

City flood control standard is defined as the flood protecting ability of the city projects, it may be expressed by the flood frequency or the return period of design flood occurrence.

Intelligent optimization is a new way of design flood frequency curve optimization fitting.