青年中文青年中文

construction stage的意思

construction stage中文翻譯:

建設階段

相似詞語短語

construction───n.建設;建筑物;解釋;造句

stage───vt.舉行;上演;籌劃;n.(Stage)人名;(英)斯特奇;vi.舉行;適于上演;乘驛車旅行;n.階段;舞臺;戲劇;驛站

stage by stage───adv.逐步地,一步一步地;分階段地

stage name───n.演員的藝名

stage manager───n.舞臺監督

trial stage───試用階段;[法] 審判階段

unicellular stage───[醫]單細胞期

initiation stage───起始階段

embryonic stage───胚期

雙語使用場景

This paper describes settlement observation technology design in the sewage treatment works construction stage.───本文闡述了污水處理廠施工階段沉降觀測的主要技術設計。

pay attention to this, to control cost in construction stage consciously.───工程結算支付是承包工程合同管理的核心。

Difficult point of organizing construction project and controlling construction stage are discussed.───論述了工程組織的難點,工程各項目實施階段的控制。

No construction work shall be carried out on Saturdays, Sundays and Public Holidays during construction stage of the Project.───建造工程期間,不能在星期六、星期日及公眾假期期間施工。

The wind tunnel experiment of Xihoumen Suspension Bridge shows that buffeting occurs under turbulent flow in each bridge construction stage.───西堠門大橋風洞試驗表明:加勁梁架設階段,在紊流條件下,橋梁的各個施工階段都發生了明顯的抖振。

The construction stage of the general contract projects is the incidental stage of accident and important stage of accident control.───總承包項目的施工階段是安全事故的易發階段,也是事故控制的重要階段。

Third, construction stage is the essential for project cost management, needed to plan carefully.───第三,施工階段是整個工程造價管理的根本,需要精打細算。

Spatial finite element models corresponding to each construction stage were established and the analysis was completed.───對每一個施工階段建立了相應的空間有限元模型,完成了分析計算。

Chapter 4 expatiates the application process of real estate project quality management in seedtime and design phase and construction stage.───第四章從前期準備階段、設計階段、施工階段三方面著手,闡述了房地產項目質量管理的實際運用過程;

英語使用場景

According to character of dam's construction stage, this article is concise analyzing the The objective management control of investment, quality, safety and progress.

The paper applies the mixed analysis to calculate the geometric nonlinear stability of space composite structures at construction stage.

Higher request is brought forward in the construction stage project cost control of Construction Company.

The smoothness control was introduced according to different construction stage of bitumen concrete pavement.

In the process of the linetype control analysis of the construction stage, the axis of the arch rib keeps round the ideal arch axis all the time.

The importance of the quality in the investment valuation and budget are mainly introduced. The action of investment control for target value in construction stage is also introduce...

In order to partial release the internal forces, the bearing of the main trusses are designed as free sliding bearings in construction stage.

The management of design alteration involves various aspects such as engineering quality, progress and investment, and prongs the whole process of construction stage.