bored piles的意思

bored piles中文翻譯:

螺旋樁(boredpile的復數形式)

螺旋鉆孔樁

填充樁

相似詞語短語

piles───n.(Piles)人名;(西)皮萊斯;n.痔瘡;痔

bored───adj.無聊的;無趣的;煩人的;v.使厭煩(bore的過去式);煩擾

bored into───鉆孔

notice bored───通知無聊

piles grow───成堆的生長

piles of───成堆的;一大團;一大批

belled piles───鐘形樁

is bored───感到厭煩

get bored───感到厭煩;感到無聊

雙語使用場景

This paper introduces the design treatment of karst caves at the location of bored piles at karst district.───本文就巖溶地區鉆孔灌注樁處在溶洞處的設計處理作一介紹。

slurry has direct impact on the bearing capacity and skin friction of bored piles.───泥漿性能直接影響鉆孔樁的承載力和樁側摩阻力。

According to the depth of the circumstances of the excavation, the bored piles and soil anchor-bar are adopted.───根據周邊環境的情況和開挖的深度,采用了鉆孔灌注樁和土釘錨桿相結合的支護形式。

The article introduces construction craft of bored piles and proposes the quality control method.───文章介紹鉆孔灌注樁施工工藝,提出質量控制方法。

Bored piles at B5 bid main navigable hole of Shanghai Yangtze River Tunnel Bridge have variable section with large diameter and length.───上海長江隧橋B5標主通航孔變截面鉆孔樁直徑大,樁長長,質量控制困難。

The application effect of the high pressure bored piles is discussed in detail.───以大型工業廠房基礎工程為例,詳細分析了鉆孔壓漿樁的應用效果。

This paper can provide guidance for the secondary cleaning of boreholes of cast insitu soft bored piles in soft subsoil in the future.───對軟土地基等多種地質條件下采用換漿法進行二次清孔的鉆孔灌注樁的施工具有一定的指導意義。

Execution of special geotechnical work. Bored piles.───專業土工工程的執行.邊樁

Based on the in-situ test data of bored piles, the mechanism of axial load transfer was analyzed.───通過樁基靜載試驗實測數據,分析了樁身軸力的荷載傳遞機理。

英語使用場景

The post-grouting technique for bored piles can increase the vertical bearing capacity of piles, decrease the subsidence and improve the engineering behaviors of piles.

In this article, the construction technique of bored piles on the riprap layer geology in the breakwater is introduced and it also discusses how to solve the difficulties in the construction.

Based on real-time stress monitoring data for super-long large-diameter bored piles, the influences of post-grouting at the end of piles on bearing characteristics of foundation piles were analyzed.

Post-grouting is an effective technique to overcome the defects of settlement of debris on the bottom and shaft side mud cakes when slurry is used in boring for bored piles.