青年中文青年中文

key construction的意思

key construction中文翻譯:

重點建設,關鍵施工

相似詞語短語

construction───n.建設;建筑物;解釋;造句

Key───n.鑰匙;關鍵,密鑰;(鍵盤樂器或電腦鍵盤的)鍵;調,聲調,色調;答案;圖例;扳手;銷子,楔,栓;翼果;板條間首層灰泥;(籃球)罰球區;低島,礁;adj.關鍵的,主要的;n.(Key)(美)基(人名);vt.鍵入,用鍵盤輸入;用別針等固定;使與……符合或關聯;使……與……共處,相安無事;用鑰匙將汽車表面劃壞;將(表面)弄粗糙;給(廣告)加識別碼;成為獲得……的關鍵

ziv construction───ziv結構

cymar construction───聚傘花序結構

calamar construction───卡拉馬建筑

participial construction───分詞結構

adams construction───adams結構

bulkhead construction───艙壁結構

ridgepole construction───脊桿結構

雙語使用場景

WP water release sluice is a key construction to ensure safe operation of the project.───王甫洲水利樞紐泄水閘工程是整個樞紐能否安全運行的關鍵工程。

For master policy business with the state key construction projects as its subject-matter insured.───對于保險標的為國家重點建設項目的統括保單業務。

Gypsum's comprehensive development project has been included in 2005 in Changde City of key construction projects.───的石膏綜合開發項目已納入了2005年常德市的重點建設項目。

In 1997, it was elected by the former State Education Commission to be one of 27 modeling Higher Engineering School of key construction .───7年被原國家教委評為全國27所示范性高等工程專科重點建設學校之一。

In 1997, the college was appraised to be one of the national 27 modeling High key construction project colleges.───1997年被原國家教委評為全國27所示范性高等工程專科重點建設學校之一。

Foreign capital is mainly used in the key construction and in technology reformation of the existing enterprise.───外資主要用于關鍵的建設項目和現有企業的技術改造。

Key construction measures of the supporting technology are given in this paper, which can reflect economic and safety of construction.───給出該支護工藝的關鍵施工措施,體現土方施工的經濟性和施工實踐的安全性。

The construction of upstream slope of cushion materials of faced rockfill dam is one of key construction items.───面板堆石壩墊層料上游坡面施工是一項關鍵項目。

A model of the project at the end of 4, before the project approval and incorporated into the city of key construction projects planned.───創模各項工程項目在4月底前立項、審批并納入城市重點建設項目計劃之中。

英語使用場景

In 1997, the college was appraised to be one of the national 27 modeling High key construction project colleges.

To increase public investment by the government with focus on key construction projects.

The demonstrating function of improving investment environment: by key construction of Export Processing Zone.

Vibration experiment indicates that the optimum time of vibration is 12 s. Finally, the paper also points out some tips and quality controlling strategies in those key construction techniques.

For master policy business with the state key construction projects as its subject - matter insured.