青年中文青年中文

metro line的意思

metro line中文翻譯:

地鐵線路

相似詞語短語

shanghai metro───上海地鐵

by metro───乘地鐵(非正式)

he metro───他是地鐵

metro ff───地鐵ff

metro train───地鐵列車

metro fapaio───法比奧計

metro desk───地鐵服務臺

line line───線條線條

take a metro───乘地鐵

雙語使用場景

Transportation: Jinjiang Amusement Park Station is accessible by No.1 Metro Line───交通:地鐵一號線至錦江樂園站

Excuse me. Where can I take Metro Line 8?───請問,我在哪里可乘坐地鐵8號線?

Excuse me, where can I take metro line 8?───抱歉,哪里可以乘地鐵八號線?

Now the system beats out the ridership of every metro line in mainland China except Beijing's.───現在證實廣州BRT客流量比除北京外中國城市的每條地鐵線的客流量都多。

That was in 1999, a time when there was no direct metro line from the airport to the downtown area.───那是1999年,當時從機場到市中心還沒有直達的地鐵。

An example of a bottom contact shoe as used on a German metro line is shown in the photo (left).───以下為一下觸式集電靴在德國地鐵中的應用(如下圖所示)。

Zhangjiang High-tech Park is best reached by taking Shanghai Metro Line 2 to its current eastern terminus, Zhangjiang Hi-Tech Park station.───張江高科技園區是最佳達成的以上海地鐵2號線到目前東部總站,張江高科技園區站。

A regression model of urban rail transit system is established and used to predict the power consumption of Shanghai Metro Line 5.───建立了城市軌道交通能耗系統的回歸模型,并利用該模型對上海軌道交通5號線的能耗進行了預測。

On the ground level and one level below ground, building provides also commercial spaces and connects to the public metro-line.───在地面和地下1的水平,建設還規定,商業空間和連接到公共地鐵線。

英語使用場景

Whether a new metro line should be built is an important investment decision problem.

This paper studies the metro line design problem in a multi - modal network with elastic demand.

This paper introduces the integration of UPS and intelligent time distribution technique of weak current systems in rail transit and its application in Shenzhen Metro Line 3 .

The paper analyzes the systematic framework and functional character of ATC system of Shanghai Metro Line 5 which is based on punctual automatic train control technology.

The northern extension of Metro Line 3 began operating last Monday.

An example of a bottom contact shoe as used on a German metro line is shown in the photo (left).

Based on the practice of Guangzhou metro line 2, the components of direct current operation power supply system and the principles and functions of its every branch system are introduced.

The automatic selling and checking system of Shenyang No. 1 Metro Line was demonstrated on subway exhibition hall.

Welcome to Chengdu Metro Line. 7, this is an inner loop line train bound for South Railway Station and Hongpailou South.