青年中文青年中文

period of construction的意思

period of construction中文翻譯:

建設期

相似詞語短語

period of───期間

construction───n.建設;建筑物;解釋;造句

phases of construction───施工階段

a period of───一個……時期;一段……時間;陣子

the period of───……時期

period───n.周期,期間;時期;一段時間;經期;課時;句點,句號;adj.某一時代的

period of time───一段時間;時段;n.時段,一段時間

cerium period───鈰周期

trial period───受審期,試用期

雙語使用場景

Tunnel surrounding rock deformation monitor is an important method for holding information of surrounding rock and controlling tunnel stability in the period of construction.───隧道施工過程中的圍巖變形監測是掌握圍巖的動態信息、確保施工期間隧道穩定性的重要手段。

During the period of construction, it is essential not only the right sense of quality but also the management with scientific control technology in the whole process.───施工期間,除了要樹立正確的質量意識外,還要應用科學的控制技術對施工全過程進行管理。

During the period of construction, the construction unit shall assign special persons to take charge of sanitation and anti-epidemic work at the construction site.───施工期間,建設單位應當設專人負責工地上的衛生防疫工作。

During the period of construction, be responsible for the quality of the equipment installation.───在建設期內,對設備的安裝質量和合理性負有責任。

Then we discuss the problem during the problem during the period of construction and development and give some pertinent suggestions.───討論了地質公園建設、開發過程中所存在的問題并提出相關措施和建議。

After ten-year period of construction, a modern and open coastal city will be put up near the coast of the East Sea.───再經過十幾年的建設,一座現代化開放的海濱城市將屹立東海之濱。

Engineering changes is related in whole life period of engineering design, and mostly in the period of construction .───工程變更涉及項目的整個生命周期,主要發生在實施階段。

We're not supposed to retain a drop, and [even] during a stated period of construction, inflow is equal to outflow.───他說“我們不應該截流哪怕一滴水,即使在規定的施工期間,流進的水量和流出的水量也是相等的。”

A serious shortage of this philosophy, approach and methods can not meet the new period of construction enterprise development requirements.───這種理念與方式、方法的欠缺與嚴重不足,已不能適應新時期對建筑施工企業的發展要求。

英語使用場景

Yet during the period of construction overseen by Brunelleschi only three men died in work-related accidents.

During this period of construction, the human character is revised and changed until at maturity a fairly well-fixed form of character is found.

The maximal flow—minimal cut theory was explained in the paper. A period of construction—cost optimization about a factual project was analysed.