side slope的意思
side slope中文翻譯:
邊坡;側坡;側面斜坡
slope───vt.傾斜;使傾斜;扛;n.斜坡;傾斜;斜率;扛槍姿勢;vi.傾斜;逃走
glacis slope───冰川斜坡
park slope───公園斜坡
side to side───從一邊到另一邊;邊對邊
slope coefficient───(粘溫特性曲線的)斜率;[統計]斜率系數
ski slope───n.[體]滑雪斜坡
slope default───坡度默認值
slope down───下坡;遞減
dry slope───(練習用)人造滑雪斜坡
roadbed design of basic content is determining roadbed side slope form and slope .───路基設計的基本內容,就是確定路基邊坡的形狀和坡度。
Results showed that soil water content could evidently reduce soil loss by wind on side slope .───結果表明,土壤含水率可以不同程度地減少邊坡的平均風蝕量。
side slope shape is always made up of simple linear slopes in traditional highway transect design.───傳統的高速公路橫斷面設計中,各種邊坡形式都由簡單的直坡段組成。
The side slope shape is always made up of simple linear slopes in traditional highway transect design.───傳統的高速公路橫斷面設計中,各種邊坡形式都由簡單的直坡段組成。
Walled on young women to hear these signals, go hand in hand to the amusement side slope duet love songs with guests.───寨上女青年聽到這些信號,結伴到游方坡同客人對唱情歌。
The landscape effect appears much valuable and emphasizes ecology environmental protection in the side slope engineering construction.───邊坡工程建設越來越重視景觀效應,強調生態環保。
The critical value at bifurcation point of the side slope with bedding rock mass is determined by its bifurcation set.───順層邊坡巖體結構在其分岔點處的載荷臨界值是由其突變模型的分岔集確定的;
Before the completion of the protection work of side slope at the tunnel opening, the tunnel body excavation shall not be started.───洞口處邊坡防護工程未完成前,不得進行洞身開挖。
The dynamic process of the roadway drainage in the side slope is simulated by using boundary element numerical method.───應用邊界元數值方法模擬研究了巷道疏干邊坡地下水的動態過程。
To recover the remainder coal in the side slope walls of surface mine by use of underground coal winning method can increase coal recovery rate and mine economic effect.
According to national standards "Construction Side slope Engineering technology Standard" (GB50330-2002) security rating division, this side slope for permanent first-level side slope.
It is definitely reliable that taking advantage of gray clustering of forecasting theory to forecast the stability of side slope .
Stability of side slope is the basic guarantee for normal production of the opencast stope.
The woods on the other side slope up toward the spruce and then the bare ledge summit of Mount Bald.
The critical value at bifurcation point of the side slope with bedding rock mass is determined by its bifurcation set.
The technical problems in anchor cable engineering at side slope are solved through side slope anchorage test for Xiaowan Hydropower Station.
The mechanical model of cutting side slope stability in frigid zone is put forward according to the research above.
Analyzing the stability of the side slope through classical ultimate balance method, the working state is fictitious without considering the stress-strain relation of the soil mass.
中文翻譯推薦
- run projects
- the time of the train
- raid attack
- sea and shore
- settledownto
- raid autodetect
- pneumonotomy
- raid for win
- precipitation event
- south west china
- public beacon
- sea and silence
- study table tennis
- trichlorophon
- reflection amplifier
- precipitation excess
- trichloropropane
- raid for you
- thousands of teachers
- staresky
- toningcream