steam generator的意思
steam generator中文翻譯:
[動力]蒸汽發生器;蒸汽鍋爐;蒸汽發電機
steam───adj.蒸汽的;n.蒸汽;蒸汽動力;水汽;精力;vi.冒水汽;蒸;用蒸汽動力推動;疾行;<非正式>開始戰斗;搶劫
generator───n.發電機;發生器;生產者
dice generator───骰子生成器
leet generator───leet發生器
steam eggs───蒸雞蛋
foregone steam───放棄的蒸汽
steam bath───n.蒸汽浴; 桑那浴
live steam───流通蒸汽; 新蒸汽;新鮮蒸汽,流通蒸汽
steam fm───蒸汽調頻
But this one would be more or less on the primary side, you're losing water from the steam generator.───但是,這個會或多或少是在主面,你不會從蒸汽發生器那失去水。
energy heats up the water, which is piped out to a steam generator.───能量將水加熱,然后通過管子輸送到蒸汽發生器中。
The primary side, which is the reactor to the steam generator which are in the containment.───第一面,則是反應堆到蒸汽,發生器,那是在容器里面的。
This energy heats oil flowing through the pipe, and the heat energy is then used to generate electricity in a conventional steam generator.───這能源熱涂油水于流動過管,而且熱能源然后用來在一個傳統的蒸氣產生器中產生電力。
The heat is then used to turn a steam generator to generate electricity in a central plant.───然后,這種熱能把曾經的蒸汽發電轉成工廠中心的發電。
And we have our steam generator as you know and the feed from the turbine goes in and the steam comes out.───我們有蒸汽發生器,如你們所知,在渦輪里產生,進入,然后,蒸汽就出來了。
When needed, the heat is pumped into a steam generator which sends electricity to the central Californiangrid.───在需要時,熱的熔體用泵輸送到蒸汽發電機,它把電力送往加利福尼亞州的中心電網。
Now we then have to condense that steam and recirculate it back either to a steam generator or back to the core.───現在,我們需要壓縮蒸氣,將它流通回去,或者到一個蒸氣發電機,或回到核心。
electron metallographic analysis of cracks of a certain steam generator tube was made by electron microscope.───用電子顯微鏡對該蒸汽發生器傳熱管管束裂紋進行斷口電子金相分析。
Additionally, steam generator design requirement of ALWR - URD are introduced.
The model simulates sodium flow in the steam generator as quasi-continuum. The model uses volume porosity, area permeability and distributed resistance to model the tubes and support plates.
Also disclosed is a superheated steam generator using a flow-through heater.
The once-through steam generator with double-side heat transfer component was presented in this paper. And the component is composed of straight tube outside and helix tube inside.
Additionally, steam generator design requirement ALWR - URD are introduced.
A metal tube split open in the steam generator of the nuclear power plant.
This paper focuses on the optimal pitch arrangement in double-side heating once-through steam generator with helix tube inside.
On the basis of CWS(Coal-water Slurry) combustion theory, The dissertation focuses on experiment and CFD calculation about combustion, ash deposition and field application on steam generator.
The nuclear unit was a primary steam generator with an oil-fired secondary superheater.
中文翻譯推薦
- try this book
- sad wen jie
- pushing aside
- robert greene
- pushing away
- sulfurization
- she has a big farm
- touch phone
- ta lishen
- telencephalons
- touch photo
- speed skate rink
- the former world champion
- so charming
- preventability
- she has a big head
- she has a big heart
- relief feeling
- under retail
- sulfurize
- robert hale