FAT的意思
「FAT」經常作為「Factory Acceptance Test」的縮寫來使用,中文意思:「工廠驗收試驗」。
FAT(工廠驗收試驗)詳細解釋
- 英文縮寫詞:FAT
- 英文單詞:Factory Acceptance Test
- 中文簡要解釋:工廠驗收試驗
- 流行度:162
- 分類:Governmental
- 領域:FDA
英文縮寫FAT的擴展資料
- Following the completion of the integrated system checkout, supplier shall demonstrate the system to company at a factory acceptance test.綜合系統測試完成之后,供應商應在工廠驗收測試時向公司演示該系統。
- The masts will be packed and loaded after the factory acceptance test in the factory onto a lorry or train, depends on the location where the factory are and the destination store will be.根據工廠所在地和儲存地點,在工廠驗收試驗(FAT)試驗后將支柱裝箱于貨車或火車。
- The factory acceptance test ( FAT ) and site acceptance test ( SAT ) of distribution automation system should be done before system putting into operation in order to ensure the product's quality. Especially, feeder automation ( FA ) testing is the key process.為保證配電自動化產品在用戶驗收階段的產品質量,需要進行出廠試驗(FAT)與現場試驗(SAT),其中,饋線自動化測試是配電自動化系統試驗的關鍵。